A is three times as fast as B and finishes a job 40 days sooner than B. How long will they take together?
If A takes t days, B takes 3t
3t − t = 40 → t = 20; B = 60
Together = 20 × 60/80 = 15 days
Answer: 15 days
Time and Work · Exercise 1 of 6
40 time and work questions at competitive-exam level: combined rates, pairs of workers, efficiency comparisons, alternate days, leaving early, work and wages. Every solution uses the LCM (unit) method one step per line.
A is three times as fast as B and finishes a job 40 days sooner than B. How long will they take together?
If A takes t days, B takes 3t
3t − t = 40 → t = 20; B = 60
Together = 20 × 60/80 = 15 days
Answer: 15 days
A can finish a job in 30 days. After A has worked 6 days, B joins him and they finish it in 8 more days. How long would B alone take?
A worked 14 days → 14/30
B did the rest, 16/30, in 8 days
B alone = 8 × 30/16 = 15 days
Answer: 15 days
A does 5% of a job each day and B does 4%. How long will they take to finish it together?
Together = 9% a day
Days = 100 ÷ 9 = 11 1/9
Answer: 11 1/9 days
A works two-thirds as fast as B, and B alone can finish a job in 10 days. How long will they take together?
A alone = 10 × 3/2 = 15 days
Together = 10 × 15/25 = 6 days
Answer: 6 days
A and B together finish a job in 15 days, and B alone takes 20 days. How long will A alone take?
A = 1/15 − 1/20 = (4 − 3)/60 = 1/60
A alone = 60 days
Answer: 60 days
A can finish a job in 7 days and B in 14 days. How long will they take together?
Job = 14 units; A = 2, B = 1 a day
Days = 14 ÷ 3 = 4⅔
Answer: 4⅔ days
A and B together finish a job in 8 days, and A alone takes 12 days. How long will B alone take to do half the job?
B = 1/8 − 1/12 = 1/24 → B alone = 24 days
Half the job = 12 days
Trap: 24 days is the whole job.
Answer: 12 days
A can paint a wall in 6 hours and B in 4 hours. How long will they take together?
Job = 12 units; A = 2, B = 3 an hour
Time = 12 ÷ 5 = 2.4 h = 2 h 24 min
Trap: 2.4 h is not 2 h 40 min.
Answer: 2 h 24 min
A can finish a job in 10 days, and A and B together take 6 days. They do it together and are paid ₹ 3,000. What is B's share?
B = 1/6 − 1/10 = 1/15
A : B = 1/10 : 1/15 = 3 : 2
B = 2/5 × 3,000 = ₹ 1,200
Answer: ₹ 1,200
A, B and C together finish a job in 4 days. A alone takes 12 days and B alone 18 days. How long will C alone take?
Job = 36 units; together 9 a day
A = 3, B = 2 → C = 4 a day
C alone = 36 ÷ 4 = 9 days
Answer: 9 days
Timed online tests with instant scores and explanations.