A and B finish a job together in 8 days and are paid ₹ 2,400. A alone would take 12 days. How much more than B does A get?
B = 1/8 − 1/12 = 1/24
A : B = 1/12 : 1/24 = 2 : 1
A = 1,600, B = 800
Difference = ₹ 800
Answer: ₹ 800
Time and Work · Exercise 4 of 6
65 moderate and difficult time and work questions, including a work-timeline chart and a wage table for data interpretation, in the style of IBPS / SBI PO and Clerk, RRB NTPC and Group D, UPSC CSAT, state PSC and IT campus placement tests.
A and B finish a job together in 8 days and are paid ₹ 2,400. A alone would take 12 days. How much more than B does A get?
B = 1/8 − 1/12 = 1/24
A : B = 1/12 : 1/24 = 2 : 1
A = 1,600, B = 800
Difference = ₹ 800
Answer: ₹ 800
A works as fast as B and C together. A and B together finish a job in 10 days, and C alone in 50 days. How long would B alone take?
a = b + c and a + b = 1/10
2b + c = 1/10 with c = 1/50
2b = 4/50 → b = 1/25
B alone = 25 days
Answer: 25 days
A is 40% more efficient than B, and B alone takes 21 days. How long will A alone take?
A's time = 21 ÷ 1.4 = 15 days
Trap: 12.6 takes 40% off the time.
Answer: 15 days
A and B together finish a job in 6 days, and A alone in 10 days. A works for 2 days, and then B alone finishes the job. How long does B take?
B = 1/6 − 1/10 = 1/15 → B alone 15 days
A did 2/10 = 1/5 → 4/5 left
B takes 4/5 × 15 = 12 days
Answer: 12 days
A finishes three-eighths of a job in 9 days. How long would he take for the whole job?
Whole job = 9 × 8/3 = 24 days
Answer: 24 days
A and B together finish a job in 10 days, and A is 60% more efficient than B. How long would B alone take?
Rates 1.6x + x = 2.6x = 1/10
x = 1/26 → B alone = 26 days
Answer: 26 days
A, B and C can finish a job in 10, 12 and 15 days. A and C work together for 2 days, and then B replaces A. How many more days do B and C take?
Job = 60 units; A 6, B 5, C 4 a day
2 days of A + C = 20 → 40 left
B + C = 9 a day → 40/9 = 4 4/9 days
Answer: 4 4/9 days
A alone can finish a job in 18 days, and A and B together in 9 days. A works alone for the first 3 days, and then B joins. In how many days in all is the job finished?
A's 3 days = 3/18 = 1/6 → 5/6 left
Together = 1/9 a day → 7.5 days
Total = 10.5 days
Answer: 10.5 days
A, B and C can finish a job in 10, 15 and 30 days. They do it together and are paid ₹ 6,000. What is B's share?
Rates = 3 : 2 : 1
B = 2/6 × 6,000 = ₹ 2,000
Answer: ₹ 2,000
A can finish a job in 12 days, and B is 20% less efficient than A. C works as fast as A and B together. How long will all three take together?
B = 15 days (rate 0.8 × 1/12)
A + B = 1/12 + 1/15 = 9/60; C = 9/60
All three = 18/60 = 3/10
Days = 3⅓
Answer: 3⅓ days