A camp has food for 1,000 men for 60 days. After 20 days, how many men must leave so that the food lasts 50 more days?
Food left = 1,000 × 40 = 40,000 man-days
For 50 days: 800 men
Leave = 200
Answer: 200
Chain Rule · Exercise 3 of 6
40 hard chain rule questions for bank mains, CSAT and state PSC: several reinforcements and departures, ration changes, three-way equivalences, shifts and difficulty factors, finding efficiencies from two teams, rounding traps and a data-interpretation table set.
A camp has food for 1,000 men for 60 days. After 20 days, how many men must leave so that the food lasts 50 more days?
Food left = 1,000 × 40 = 40,000 man-days
For 50 days: 800 men
Leave = 200
Answer: 200
A garrison has rations for 40 days. After 8 days a reinforcement of 1,200 men arrives, and the rations then last 16 more days. What was the original strength?
Rations left = 32n man-days
32n = (n + 1,200) × 16
16n = 19,200 → n = 1,200
Answer: 1,200
In a day, 4 men do as much work as 6 women or 10 children. 10 children finish a job in 30 days. How long will 8 men, 6 women and 10 children take together?
In child-units: man = 2.5, woman = 5/3
Job = 300 child-days
Team = 20 + 10 + 10 = 40 units
Days = 300 ÷ 40 = 7.5
Answer: 7.5 days
30 workers make 900 items in 6 days. Productivity per worker then rises by 25% while the workforce falls to 24. How many items are made in 8 days?
Items per worker-day = 900 ÷ 180 = 5 → 6.25 after the rise
24 × 8 × 6.25 = 1,200
Answer: 1,200
5 identical pumps empty a tank in 3 hours. After 1 hour, 2 pumps break down. How long does it take in all to empty the tank?
Job = 15 pump-hours
First hour: 5 done → 10 left
3 pumps take 10/3 h = 3 h 20 min
Total = 4 h 20 min
Answer: 4 h 20 min
18 binders bind 900 books in 10 days. How many binders are needed to bind 660 books in 12 days?
Binders = 18 × (660/900) × (10/12)
= 18 × 11/15 × 5/6 = 11
Answer: 11
A contractor has 100 men to finish a job in 40 days. After 30 days only three-fifths of the job is done. How many more men are needed to finish on time?
Three-fifths = 3,000 man-days → whole job = 5,000
Left = 2,000 man-days in 10 days → 200 men
More = 200 − 100 = 100
Answer: 100
3 men do as much work as 2 machines. 6 men and 4 machines finish a job in 10 days. How long will 9 machines alone take?
6 men = 4 machines → team = 8 machines
Job = 80 machine-days
9 machines take 80/9 = 8 8/9 days
Answer: 8 8/9 days
A water stock lasts 30 days for 120 people using 5 litres each a day. After 10 days, 40 people leave and the rest start using 6 litres a day. How long will the remaining water last?
Stock = 120 × 30 × 5 = 18,000 L
Used in 10 days = 6,000 → left 12,000
Daily use now = 80 × 6 = 480 L
Days = 12,000 ÷ 480 = 25
Answer: 25 days
6 painters paint 3 identical halls in 8 days. A helper works at half a painter's rate. How long will 4 painters and 4 helpers take to paint 5 such halls?
One hall = 6 × 8 ÷ 3 = 16 painter-days
5 halls = 80 painter-days
Team = 4 + 4 × 1/2 = 6 painters
Days = 80 ÷ 6 = 13⅓
Answer: 13⅓ days
Timed online tests with instant scores and explanations.