3 men do as much work as 2 machines. 6 men and 4 machines finish a job in 10 days. How long will 9 machines alone take?

  • A 10 days
  • B 8 8/9 days Correct
  • C 9 days
  • D 7 1/2 days
Correct Answer: Option B

6 men = 4 machines → team = 8 machines

Job = 80 machine-days

9 machines take 80/9 = 8 8/9 days