A man's daily work equals that of 2 women or 3 children. 8 men finish a job in 15 days. How long will 6 women and 9 children take?
6 women = 3 men; 9 children = 3 men
Team = 6 men
Job = 120 man-days → 20 days
Answer: 20 days
Chain Rule · Exercise 2 of 6
40 medium chain rule questions for bank, railway and placement tests: men joining or leaving midway, garrisons with reinforcements, contractors behind schedule, men–women–boys equivalences, mixed hours and efficiency, and currency or price chains – each solved one step per line.
A man's daily work equals that of 2 women or 3 children. 8 men finish a job in 15 days. How long will 6 women and 9 children take?
6 women = 3 men; 9 children = 3 men
Team = 6 men
Job = 120 man-days → 20 days
Answer: 20 days
7 notebooks cost ₹ 245, and 5 pens cost as much as 2 notebooks. What do 12 pens cost?
Notebook = 245 ÷ 7 = ₹ 35
5 pens = 2 notebooks = ₹ 70 → pen = ₹ 14
12 pens = ₹ 168
Answer: ₹ 168
3 large pumps do the work of 5 small pumps. 6 large and 5 small pumps empty a tank in 9 hours. How long will 9 large and 10 small pumps take?
In small-pump units: large = 5/3
6 large + 5 small = 10 + 5 = 15 units → job = 135 unit-hours
9 large + 10 small = 15 + 10 = 25 units
Time = 135 ÷ 25 = 5.4 hours
Answer: 5.4 hours
4 ovens bake 240 loaves in 3 hours. How many ovens are needed to bake 600 loaves in 2.5 hours?
Ovens = 4 × (600/240) × (3/2.5)
= 4 × 2.5 × 1.2 = 12
Answer: 12
A ship has food for 600 crew for 50 days. After 20 days, 200 crew leave and each person's ration is cut by one-fourth. How long will the remaining food last?
Food left = 600 × 30 = 18,000 full rations
Daily use now = 400 × 3/4 = 300
Days = 18,000 ÷ 300 = 60
Answer: 60 days
36 men finish half of a job in 20 days. How many more men are needed to finish the other half in 15 days?
Half = 36 × 20 = 720 man-days
In 15 days: 720 ÷ 15 = 48 men
More = 48 − 36 = 12
Answer: 12
A school of 450 students uses 2,700 litres of water a day. If 60 more students join and each student's daily use is cut by 10%, how much water will the school use daily?
Use per student = 6 L → 5.4 L after the cut
Students = 510
510 × 5.4 = 2,754 litres
Answer: 2,754 litres
15 coders write 3,000 lines of code in 4 days. How many coders are needed to write 4,500 lines in 3 days?
Coders = 15 × (4,500/3,000) × (4/3)
= 15 × 1.5 × 4/3 = 30
Answer: 30
8 weavers weave 8 mats in 8 days. How many mats will 16 weavers weave in 16 days?
One weaver weaves 1 mat in 8 days
In 16 days one weaver makes 2 mats
16 weavers make 32 mats
Trap: 16 doubles only one factor.
Answer: 32
25 men can reap a field in 20 days. After how many days should 5 men leave so that the work is finished in 23 days?
Job = 500 man-days
25x + 20(23 − x) = 500
5x + 460 = 500 → x = 8
Answer: 8
Timed online tests with instant scores and explanations.