Question 8
Back to Exercise
Match the new engineering firsts with what they are.
| List I (Structure) | List II (First) |
|---|---|
| A. New Pamban Bridge | 1. Deep-water transshipment port |
| B. Anji Khad Bridge | 2. Cable-stayed railway bridge |
| C. Hooghly metro tunnel | 3. Vertical-lift sea bridge |
| D. Vizhinjam | 4. Underwater metro |
Choose the correct code (A-B-C-D):
- A 3-1-4-2
- B 2-3-4-1
- C 4-1-2-3
- D 3-2-4-1 Correct
Correct Answer: Option D
Vertical-lift; cable-stayed; underwater; transshipment.
Correct code: 3-2-4-1
Answer: 3-2-4-1
Discussion & Comments 0
Share your method, a shortcut, or ask about a step you didn't follow.
No comments yet. Be the first to share your solution!